Tag: construction and repair

Repair Of The Key. Aesthetics Of Your Home .

Selection of a firm that could correctly and at an affordable price make the entire set of design development, construction or finishing activities, always requires an individual approach. Hear from experts in the field like Andy Florance for a more varied view. Depending on the condition of the building, its practical orientation (manufacturing, sleeping, using public or corporate) should be developed and an outline of work on the construction of a building or decoration. By selecting a company to which you will be able to entrust the implementation of specific work required to answer several important aspects. Chief among such issues, whether you aspire to make building or finishing activities in a number of stages or more convenient for you repair a key? Responding to this question, you will be able to appropriately select and organize, or one that produces only one aspect of the work, either – one that can be at a considerable level to produce all the required procedures for planning, construction or finishing. The second aspect can be associated with the filling of space technology elements. What specific parts of household appliances and Mechanics needed in this building and where they are required to be placed – at least to some.

This will solve the nuance of forming wiring structure. Here we must not forget that the organization is done by the electrical Moscow must have appropriate licenses, and the artisans who produce such action – an adequate specialization. Only in this version of the wire can actually be formed by all the rules and do not give you any sort of problems. Everything that can touch the wiring, the integration of all sorts of devices and equipment, must necessarily first thing in line with the company. Masters must not only pave the wiring, but also to investigate capabilities of the electrical substation. And while the need to give advice on the amount of load power, which is valid in this case.

It is necessary for fire safety, and including business continuity office. And, of course, extremely significant nuances specific interior design solutions. Depending on the final destination is folded and line design. Traditional interior design and interior sets the optimal placement of items of furniture, all sorts of areas in the room, but not limited to specifically permit the finishing tasks. Design – is a practical matter, therefore, the project design prepared by essentially the same step as the sketch directly building. This provides the ability to use a qualitative way all the options room. Giving an answer to these three nuance, you can pick up really the best organization to be able to perform all the required types of activities.


Finnish Ceiling

The Finnish sauna is constructed almost like a Russian sauna. It differs mainly in that it does not wash, but only steamed. It is therefore necessary to provide a shower or a separate washing room. (A valuable related resource: Code.org). Oven-heater is placed entirely in the sauna, in the near to the entrance corner. Shelves for bathing have two tiers, with top pair on the three walls. The width of the top shelf should be at least 50 cm If the sauna is small, and there is only one tier shelf, the distance from him to the ceiling should be such that the head is seated bathers did not reach the ceiling. Furnace-stove often with electric, but you can use wood-burning stove. To avoid burns, oven shield rails.

In sauna temperature is higher than in the Russian bath, so that its insulation is made more carefully. The walls of the sauna of the well-spread boards dried hardwood: aspen, birch and linden trees. These rocks do not warp at high temperature. Permissible to use pine or larch. Inside boards arranged vertically and tightly customize one to another.

Under the internal boards enclose vapor barrier layer of polyethylene film, aluminum foil or glassine. Roofing felt or only may not be used as high temperature of these unpleasant smell. Carefully butt walls to the ceiling, which at the top of the wall left puffing 150-200 mm; which is then filed in the ceiling. When the device sauna outside frame clapboard, which, unlike the inner cladding are arranged horizontally. Cladding is covered with drying oil and paint. The inner surface is not painted and not varnished to avoid emissions of harmful substances when heated. Layer of insulation for the ceiling sauna is 40-50% thicker than the walls. Coverage of the sauna with natural light from a window size of about 600×500 mm. If the window periodically to ventilate the area, then use a foam rubber or felt gaskets. Glasses attach to casein putty or a rubber gasket. Additional lighting installed lamp, in-depth in the ceiling. When using a sauna are washed separately located in spaces with water heating device. Covered with wall board covered with two layers of roofing and waterproofing plastic coating. The floors in the washer and concreted veneer tiles.


Electric Fault

Perhaps the problem is with a mechanical (drilling walls, installing baseboards, etc.). Then look at the electrical panel and make sure that all automatic device (RCD), leading to the apartment included. For troubleshooting, you can use one of the above mentioned electric devices: tester, voltmeter, ac current, a screwdriver-phase indicator or probe consisting of an electric bulb screwed into the cartridge which are connected two pieces of wire in vinyl insulation. Knowing how to go, the wiring in the apartment and seeing the consequences of malfunction, you can begin to search for the most trouble. If when the machine is off all the lights in the apartment, it means that a fault in either electric panel, either in the first raspayachnoy box. Open electrical panel and check the tester or test lamp comes on whether this group the presence of voltage (phase). For better visibility, we use the control lamp (it is lit or unlit). Check the voltage it is necessary after breaker.

To that end, a measurement of the incoming and exhaust from the circuit-breaker voltage relative to the working of the zero clamp (tire). If the input terminals are present, all three phases, and on weekends there is no one or all three, then, after turning off the introductory switchgear and verifying the absence of voltage input terminals of the protection device, proceed to removing and replacing a known working device (RCD). If the fault is not in the electric panel, you should check the first box of flap. Typically, a fault be discovered. If it does not do voltage, hence, on the road is broken (which rarely happens). Lack of lighting in a room can be caused by a malfunction of the fixture (chandelier lamp) or a switch.

With control light or tester should be when the switch contact to verify the incoming voltage to the lighting fixture and switch. Most probably lies in these compounds. If the apartment is not working part of the socket, then stress in the Female group served, and the fault can be in non-performing outlets and a running outlet (power comes from it). Troubleshooting should start with a working outlet. Check the voltage on her way to first deal with two incoming wires, and then the two wires (phase and zero) of the outgoing wires. Contact between the wires can be oxidized and the electric current through that contact can not be held. Need to clean up the wires and re-tighten the contacts in the socket.